Project Overview
- A Tier III Data Center
- The project was constructed in an operational laboratory building
- Contains two uninterruptable power systems
10,330 sq. ft. interior renovation to the first floor of Module K to create a Tier III Data Center. The project included the construction, commissioning and migration of the Data Center.
The project was executed in an existing operation laboratory building and included the installation of two new roof mounted air-cooled water chillers, two new 1500KW diesel generators, a separate mechanical/electrical floor housed with extensive environmental control systems and installation of two uninterruptable power systems (UPS) including a Liebert UPS and a Piller Rotary UPS.